Elmswell for Bloor Homes

The small village of Elmswell is just off the A14 past Bury St Edmunds. School Road is the main traffic route through the village and our project is within this road and entrance to the housing estate. A road closure was needed for 12 weeks to complete the 278 project.

Client

Bloor Homes

Project Type

Ground Support

About The Project

Excavation of pump station at 5m deep Reduce area by 2.5m shelving at .600mm x .600mm. creating a lower platform for the excavator to sit on. Once achieved excavate and place man hole box a further 2.5m into the ground along with all associated equipment. Safe access and egress into the excavation to pour RC Slab.

Contact Us

14 + 2 =

Address

20 Spring Drive, Stevenage, Hertfordshire SG2 8AZ

Phone

07561 205 894

Email

HS Direct Approved, HR & Employment Law, Health & Safety

Projects managed as self employed through sub contractor only.

Aerial photography courtesy of MV Kelly.