Little Paxton for Bloor Homes

The project is a small village in St Neots with an entrance off the Great North Road running parallel with the A1. A mixture of 2, 3, 4 bedroom properties, driveways, garages and large garden areas.

The Great River Ouse runs along the east rear side of the site, throughout the construction phase all environmental considerations and legislation was adhered to.

Client

Bloor Homes

Project Type

Retaining Walls

About The Project

Construct foundations for the installation of enviromesh wall, In stages laying the wire mesh in positions which overlap and creating a 70 degree angle formed batter. Filling and compacting with type class 2 material in stages to reach the desired height required.

Contact Us

4 + 14 =

Address

20 Spring Drive, Stevenage, Hertfordshire SG2 8AZ

Phone

07561 205 894

Email

HS Direct Approved, HR & Employment Law, Health & Safety

Projects managed as self employed through sub contractor only.

Aerial photography courtesy of MV Kelly.