Little Paxton for Bloor Homes
The project is a small village in St Neots with an entrance off the Great North Road running parallel with the A1. A mixture of 2, 3, 4 bedroom properties, driveways, garages and large garden areas.
The Great River Ouse runs along the east rear side of the site, throughout the construction phase all environmental considerations and legislation was adhered to.
Client
Bloor Homes
Project Type
Retaining Walls
About The Project
Construct foundations for the installation of enviromesh wall, In stages laying the wire mesh in positions which overlap and creating a 70 degree angle formed batter. Filling and compacting with type class 2 material in stages to reach the desired height required.
Contact Us
Address
20 Spring Drive, Stevenage, Hertfordshire SG2 8AZ
Phone
07561 205 894
HS Direct Approved, HR & Employment Law, Health & Safety
Projects managed as self employed through sub contractor only.
Aerial photography courtesy of MV Kelly.