Little Paxton for Bloor Homes

The project is a small village in St Neots with an entrance off the Great North Road running parallel with the A1. A mixture of 2, 3, 4 bedroom properties, driveways, garages and large garden areas.

The Great River Ouse runs along the east rear side of the site, throughout the construction phase all environmental considerations and legislation was adhered to.

Client

Bloor Homes

Project Type

Underground tanks and pump stations

About The Project

5m deep FW pump station and valve chamber installation, RC Foundation and starter bars which wrapped the chamber in an RC Concrete surround throughout the height. De watering throughout as depths were lower than the existing stream close by. Brick built valve chamber allowing for tanking to perimeter. All mechanical and electrical works by sub contractors.

Contact Us

1 + 5 =

Address

20 Spring Drive, Stevenage, Hertfordshire SG2 8AZ

Phone

07561 205 894

Email

HS Direct Approved, HR & Employment Law, Health & Safety

Projects managed as self employed through sub contractor only.

Aerial photography courtesy of MV Kelly.